5 Steps to Scope an AI Project in Medical Affairs That Survives Review and Outlasts the Pilot
Most AI pilots in pharma do not fail because the technology does not work. They stall because they were scoped to impress in a demo rather than to hold up in review, in real workflows and at scale. This guide walks you through five steps to scope one that lasts.
Suhina Singh
Founder & CEO, Jonda Health
October 17, 2026
·
11 min read
The five steps at a glance
Five steps, two questions in each. Steps 3 and 4 can run in parallel. Timings are a rough guide for a single, well-defined use case.
How to use this guide
Read it once end to end before you start, so you know what is coming in the later steps.
Work through the steps with a small core team: a business owner, someone from the user group, and someone who understands the data.
Write your answer to each question in one or two sentences. If you cannot, that is the gap to close before building.
Use the tips and pitfalls under each question to check your thinking, and the table at the end to review the full scope.
If you work in medical affairs or digital innovation in pharma, you have probably seen a version of this story. An AI idea gets energy and a small budget. A vendor or an internal team builds a pilot. The demo impresses leadership. Then the project slows: compliance has questions nobody anticipated, the data turns out to be messier than the demo data, the business owner changes roles, and nobody has budgeted for running it at scale. Months later, the pilot is quietly retired.
There is a very human reason this happens. Most of us want a project that shows value, for the organisation and for our own growth, and we want it quickly. Keeping up with how fast AI is changing is hard, and nobody can be an expert in the technology, the data, the regulations and the workflow all at once. So shortcuts are tempting: a narrow demo, clean sample data, reviewers brought in at the end. The five steps below are designed to replace those shortcuts with a scope that holds up.
Same idea, same technology, different outcome.
Step 1
Define the problem
Who to involveThe project owner and three to five future users
Time to allow1 to 2 weeks, mostly short conversations
1. Whose problem is this, and how do they experience it today?
Strong projects start with a specific group of people and a specific frustration: medical information specialists rewriting similar responses, MSLs preparing for visits, programme teams processing enrolment documents. Talk to them before you scope. If the people who will use the tool do not recognise the problem as theirs, adoption will be difficult no matter how good the technology is.
TipAsk users to walk you through the last time they did the task, step by step. Real examples reveal far more than general opinions.
Common pitfallScoping from a leadership idea or a vendor demo, then looking for users who fit it.
Ask before you buildHave we spoken to the people who will use this, and can we describe their current process step by step?
2. What task or decision will change, and what will not?
Define the scope in terms of work, not technology. "Use a large language model for medical affairs" is not a scope. "Draft first responses to routine medical information enquiries from approved content, for medical review" is. Be equally clear about what is out of scope, because AI projects expand easily and every expansion brings new reviewers and new risks.
TipWrite an "out of scope for this phase" list and share it with sponsors. It protects the timeline when new ideas arrive.
Common pitfallAdding "while we are at it" features during the pilot, each of which needs its own data and review.
Ask before you buildCan we describe, in one sentence, the task that changes and the boundary we will not cross in this phase?
You are ready for step 2 when you can name the users, describe their current process, and state the task that changes in one sentence.
Step 2
Agree the value
Who to involveThe project owner, the sponsor and a user representative
Time to allowAbout 1 week, including measuring the baseline
3. How will we know it worked?
A demo shows that something is possible. A pilot should show that it is worth doing. Measure the current process before you start: time per task, turnaround, error rate, backlog, or the quality of outputs. Then agree the measures you will compare after the pilot, and what result would justify scaling. Without a baseline, even a successful pilot is hard to defend.
TipPick two or three measures at most, and agree the "scale or stop" threshold with your sponsor before the pilot starts.
Common pitfallMeasuring only after the pilot, so there is nothing credible to compare against.
Ask before you buildWhat is our baseline today, and what result in the pilot would justify the investment to scale?
4. Who benefits, personally and organisationally?
Projects move when people can see what is in it for them. Think about value at three levels: for the people doing the work (less repetitive effort, more time for judgement), for the function (capacity, consistency, insight), and for the organisation (outcomes, speed, evidence). Be honest about who gains and who carries extra effort during the transition. A project owner who can speak to all three levels is far better placed to secure support for scaling.
TipWrite one sentence of value for each level. Use them in every update, so the story stays consistent as the project grows.
Common pitfallDescribing value only as "efficiency", which rarely motivates users and is easy for budget holders to question.
Ask before you buildCan we describe the value for the users, the function and the organisation, and who carries the effort during the change?
You are ready for step 3 when you have a measured baseline, an agreed threshold for scaling, and a value statement for each level.
Step 3
Check the data
Who to involveData owners, IT or data teams, and privacy
Time to allow2 to 4 weeks, in parallel with step 4
5. What data does it depend on, and is it ready?
Many AI projects are data projects in disguise. A tool that drafts from approved content depends on a clean, current content library. A tool that analyses real-world or programme data depends on records that may be scanned, multilingual and inconsistent. Pilots often use a small, tidy sample; real use brings the full variety. Assess the real data early, because it usually determines timelines more than the model does.
TipAsk for a sample that includes the awkward cases: scans, handwriting, other languages, incomplete records. That is where performance is really decided.
Common pitfallTesting on a curated demo set, then discovering in rollout that most real records look nothing like it.
Ask before you buildHave we tested the approach on a realistic sample of the data it will see in daily use, not just a clean demo set?
6. Are we allowed to use this data in this way?
Data collected for one purpose is not automatically available for another, and AI adds new questions: where data is processed, whether it leaves the country, whether a vendor stores it or uses it to train models, and whether personal or health information is involved at all. Settling these questions during scoping prevents the most common late-stage blocker.
TipDraw a simple data flow diagram showing where data goes at each step. Privacy and legal reviewers can respond to a picture much faster than to a description.
Common pitfallAssuming a vendor's standard terms settle data processing and model training questions without checking them.
Ask before you buildDo we know where the data will be processed, whether it crosses borders, and whether it will be used for anything beyond our task?
You are ready to finalise the scope when the approach has been tested on realistic data and the data flow has been reviewed by privacy.
Step 4
Bring in reviewers
Who to involveMedical, legal, compliance, privacy, pharmacovigilance, quality, IT security, affiliates as relevant
Time to allowRuns alongside step 3; one early session, then follow-ups
7. Who needs to review this, and have they been involved from the start?
Depending on the use case, reviewers may include medical, legal, compliance, privacy, pharmacovigilance, quality, information security and local affiliates. Bringing them in at the scoping stage turns them from gatekeepers into co-designers. Their questions are usually reasonable and predictable; answering them upfront is far cheaper than rebuilding after a late review.
TipHold one short early session with all reviewers together, share the one-sentence scope and data flow, and ask each function what would stop them approving it at scale.
Common pitfallWaiting until the pilot "proves itself" before involving reviewers, then rebuilding to meet requirements that were knowable on day one.
Ask before you buildWhich review functions will need to approve this at scale, and have they seen the scope yet?
8. Where do people stay in the loop, and how is quality checked?
Decide which outputs a qualified person must review, what the tool may do on its own, and how you will measure accuracy before and after launch. For anything that reaches a clinician or patient, or that could involve safety information, human review and a clear audit trail are usually essential. Writing this down early also makes the conversation with reviewers much easier.
TipBuild a small test set of real examples with agreed correct answers. Use it before launch and every time the model, prompts or content change.
Common pitfallTreating "a human reviews it" as the whole control, without defining what they check or tracking how often they correct the tool.
Ask before you buildWhich outputs need human review, how will we measure accuracy, and can we show how each output was produced?
You are ready for step 5 when each review function has seen the scope, their conditions are written down, and human review points are defined.
Step 5
Plan for scale
Who to involveThe future business owner, finance, IT and the user group
Time to allowAbout 1 week
9. Who owns it after the pilot?
Pilots often have an enthusiastic sponsor and a project team. Products need a business owner, a budget line, support arrangements, and someone responsible for keeping content, models and integrations current. If nobody is named to own the tool after the pilot, it will struggle to survive the first reorganisation or budget cycle.
TipAsk the future owner to co-sign the scaling criteria from step 2. Ownership is much easier to secure before the pilot than after it.
Common pitfallAn innovation team owns the pilot, and nobody in the business has agreed to take it on.
Ask before you buildWho will own, fund and maintain this after the pilot, and have they agreed?
10. What will it cost to run at scale, and will it fit how people work?
Running costs are easy to underestimate: model usage grows with volume and with how efficiently prompts and data are designed, and there are also costs for integration, monitoring, review time and updates. Equally important is fit: a tool that sits outside existing systems, or adds steps to a busy day, will be used less than planned. Scope for the workflow at scale, not only the pilot.
TipEstimate cost at three volumes: pilot, one market, all markets. It quickly shows whether the design is efficient enough to scale.
Common pitfallA standalone tool that users must log into separately, which quietly loses usage once the pilot attention fades.
Ask before you buildHave we estimated running costs at full volume, and does the tool fit into the systems and routines people already use?
Your scope is ready to build when there is a named owner with a budget, a running cost estimate at scale, and a plan for how the tool fits existing workflows.
Review your scope: holds up or stalls?
Before you commit budget, check your scope against this table. Most stalled pilots show several of the patterns on the right.
Step
Holds up
Stalls
1. Problem
Specific users, specific task, clear boundary
"Use AI for medical affairs"
2. Value
Baseline measured; scaling criteria agreed
Success judged by the demo
3. Data
Tested on realistic data; permissions settled
Clean sample only; data questions deferred
4. Reviewers
Involved from scoping; human review defined
Reviewers see it for the first time at the end
5. Scale
Named owner, budget and running cost estimate
No owner or budget after the pilot
How Jonda Health can help
Our team has seen this from several sides: from inside pharma medical and digital teams, as investors in digital health, and as builders who have scoped, shipped and rebuilt our own products, learning a few lessons the hard way. You do not need to have everything figured out before talking to us. There are two ways we can support you.
Jonda Health Services
Scope, design and deliver projects that scale
Through our Digital Health Strategy, Experience Design and Automation and Digital Enablement work, we can take you through these five steps, involve the right reviewers early, design for real workflows, and move from plan to pilot to rollout.
JondaX
Get the data foundation right
When your AI project depends on clinical data in PDFs, scans, images and mixed formats across more than 10 languages, JondaX turns it into structured, standardised information through a single API, checked by clinically trained reviewers to 99% field-level accuracy. It is ISO 27001 certified, designed to comply with HIPAA, GDPR and PDPA, and can process data fully in country where required.
Book a free 30-minute AI project scoping conversation
Bring the idea you are exploring, or the pilot that has stalled, and we will work through the five steps together and talk about what it would take to make it hold up.